72 Nation72 NATION
Programs

From one machine to the whole estate.

Rollout runs in four stages. Each one has to hold on a real fleet before the next one starts.

I

Survey the estate

We inventory the machines in scope, confirm hardware support, and write down with the organization which systems the OS is expected to cover and which are deliberately left alone.

2–3 weeks
II

Build the image

The ISO is assembled for that estate — the offline start page, the browser's portal and support links, and the software set the organization actually uses. One image, reproducible, versioned.

3–5 weeks
III

Run a pilot fleet

A bounded group of machines runs the OS as their daily driver, including with the network pulled. What breaks is logged and reported as found, not smoothed over before the review.

One quarter
IV

Extend across the estate

Imaging widens machine by machine. The organization's own IT owns provisioning and updates, with our engineers on hand rather than in control.

Ongoing
What we need from you

Three things, before stage one.

A named owner

One person inside the organization who can approve access and sign off the scope of the estate.

An estate inventory

The machines in scope, their hardware, and the software the people on them cannot do their job without.

A stated boundary

Written agreement on what the deployment is expected to protect against, set before it starts.